EasyManua.ls Logo

SLE SLE4000 - Month; 10,000 Hour Overhaul Procedure

SLE SLE4000
312 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 82 (Model K)
16.4 24 month / 10,000 hour overhaul procedure
The following instructions, list the order in which the 24 month overhaul should be carried
out.
1. Remove the five fixing screws (A)
indicated from the rear cover.
2. Slide the rear cover towards the rear of
the machine. When the lip has been
disengaged lift the cover off.
A
A
A
A
A

Table of Contents

Related product manuals