Chapter 2 - Machine installation
20
5) ASSEMBLY OF THE PACK DEVIATOR DEVICE
• Screw the pack deviator device 7 into the prepared hole on the machine as shown in the
figure.
2.6 ELECTRICAL CONNECTION
Power must be cut from the machine for all operations involving connection to the electrical
network.
ATTENTION!
Whenever accessing the electrical system, remember to cut the power and to wait at
least five minutes before operating.
THE EARTH CONNECTION IS COMPULSORY!
Connecting the machine to the mains must be carried out in compliance with standards in force
in the user's country.
Check to make sure that the machine's power supply frequency and voltage (see plate
applied on the machine) correspond to the power supply network.