C-87
Rear Attachment
42-582 GREEN STAR RBS SPIKER SET (3) DRAWING
REF# PART# DESCRIPTION QUANTITY
1 11-094 Pillow Block 6
2 HNJ-114-12 Jam Nut, 1
1
/
4
- 12 6
3 42-583 Spiker Blade 33
4 8965-1�875 Spiker Blade Spacer (1�875") 30
5 42-554 Spiker Shaft 3
6 42-578 Spiker Cover 6
7 42-574 Fork 3
8 18-295 Oilite Bushing (part of 42-574) 6
9 HB-516-18-075 Hex Bolt,
5
/
16
- 18 x
3
/
4
12
HNTL-516-18 Nylon Lock Nut,
5
/
16
- 18 12
10 HB-38-16-150 Hex Bolt,
3
/
8
- 16 x 1
1
/
2
12
HWL-38 Lock Washer,
3
/
8
12
HW-38 Flat Washer,
3
/
8
12
HN-38-16 Hex Nut,
3
/
8
- 16 12
11 42-586Q Green Star RBS Main Frame 1
12 42-539 Lynch Pin,
5
/
16
(part of main frame) 3
ADJUSTMENTS AND OPERATION INSTRUCTIONS
ADJUSTMENT
The springs are preset for maximum down pressure, and should not need to be adjusted� If you feel the need
to adjust the springs please call for further instructions� The unit comes pre-adjusted for most models� The
four adjustment holes on the hitch are for making sure all three spikers are touching the ground at the same
pressure� When installing spiker system start with the lower mounting holes on hitch�
Tire pressure should be 4 psi in the front and 7 psi in the rear tire for best traction�
OPERATION
Make sure the spiker system has been installed and adjusted properly for your model of bunker rake� Always
spiking� Do not spike up steep slopes or loss of traction may result� Do not turn while spiking�
To begin spiking, lower unit all the way down as you come across collar and continue straight across green
-
ing�
INSTALLATION