Smoracy, LLC
Copyright 9/13 INSERT
MODELS 2680/3680
Iftheendproductchipsizeneedstobebigger,pocketllerscanbeaddedtoveoftheknifepockets.The
chipper drum is considered to be a 2 knife chipper drum because it takes 2 full cuts across the width of the
chipperdrumperrevolution.Ifthepocketllersareaddedtoveoftheknifepockets,thechipperdrumwill
become a 1 knife chipper drum and produce larger chips.
CHIPPER DRUM POCKET FILLERS
CHIPPER SECTION
To install the pocket llers:
1. The knives and pocket holders need to be removed out of the 5 knife pockets that are numbered.
2. Clean the Loc-Tite out of the threaded holes in the knife holder.
3. Installthenumberedpocketllertocorrespondingknifepocket.
4. UsingLoc-Tite242(blue),boltthepocketllerinwiththeknifeholdersocketheadcapscrews.
5. Torque the socket head cap screws to 250 ft.-lbs. (339 Nm).
Numberedknifepocketller
Numbered knife pocket with the
knife holder removed.