EasyManua.ls Logo

Snap-On LEVEL5ATC - Drawer Training Procedures

Snap-On LEVEL5ATC
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
ATC Toolbox Setup
ATC BOX SETUP
DRAWER TRAINING
Although each tool box has drawer training performed during manufacturing, the procedure must be performed again
upon installation on the job site. Drawer training ensures optimized camera efciency when tools are removed and re-
turned. Every job site has unique lighting conditions which necessitate the training. Follow these detailed instructions for
proper training.
The Drawer training procedures can be performed when the foam molding gets dirty and/or changes color, when the tools
are worn, or light conditions have changed from last training.
Three drawer training procedures are available:
First is a complete training procedure required when new drawer liners, tools or cameras are installed.
The second procedure is a much quicker or Abbreviated procedure that skips several steps including tool removal.
This procedure allows the box user to again optimize changing light or tool conditions to optimize performance.
The third procedure produces the highest level of training accuracy and should be used to achieve the highest level of
performance.
All new boxes when setup for the rst time will display a note stating the cameras have already been trained. This is be-
cause they are trained during the manufacturing procedures to ensure proper operation.
NOTE: A USER MUST HAVE TRAINING PERMISSIONS TO PERFORM DRAWER OR BOX MAINTENANCE.
NOTE: ALL TOOLS CONTAINED IN THE DRAWER(S) BEING TRAINED MUST BE AVAILABLE AND PRESENT FOR
PROPER TRAINING.