Page 2 - 6 UL25/UL32/UL40
CONTENTS
INTRODUCTION 2-7
GENERAL DESCRIPTION 2-7
SPECIAL LIMITATIONS 2-8
PLATFORM CAPACITY 2-8
MANUAL FORCE 2-8
LIFT LEVEL SENSOR INTERLOCK 2-8
CONTROLS/PRE-OPERATION 2-9
PLATFORM CONTROLS AND INDICATORS DC 2-9
CHASSIS CONTROLS AND INDICATORS DC 2-9
PLATFORM CONTROLS AND INDICATORS AC 2-10
CHASSIS CONTROLS AND INDICATORS AC 2-10
PRE-OPERATION SAFETY INSPECTION 2-11
OUTRIGGER INTERLOCK TEST 2-12
LEVEL SENSOR INTERLOCK TEST 2-12
SYSTEM FUNCTION INSPECTION 2-13
OPERATION 2-14
OUTRIGGER INSTALLATION 2-14
PLATFORM ELEVATION 2-14
PLATFORM LOWER 2-14
BATTERY CONTROLLED LED 2-14
EMERGENCY PROCEDURE 2-15
EMERGENCY LOWERING 2-15
TRANSPORTATION 2-16
AFTER USE EACH DAY 2-16
TRANSPORTING THE WORK PLATFORM 2-16
TRUCK 2-16
DC MODELS 2-16
LOADING 2-19
UN-LOADING 2-18
PASSAGE THROUGH A DOORWAY 2-18
LOWERING 2-19
RAISING 2-19
MAINTENANCE 2-21
BATTERY MAINTENANCE 2-21
BATTERY CHARGER 2-21
HYDRAULIC FLUID 2-22
HYDRAULIC FLUID CHECK 2-22
INSPECTION AND MAINTENANCE 2-23
DAILY PREVENTATIVE MAINTENANCE SCHEDULE 2-24
SPECIFICATIONS 2-25
WASTE REMOVAL AND DISPOSAL 2-26