EasyManua.ls Logo

Snorkel UL40 - Inspection and Maintenance

Snorkel UL40
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 2 - 23UL25/UL32/UL40
The complete inspection consists of periodic visual and operational checks along with periodic mi-
nor adjustments that assure proper performance. Daily inspection will prevent abnormal wear and
prolong the life of all systems. The inspection and maintenance schedule should be performed by
personnel who are trained and familiar with mechanical and electrical procedures.
!
W A R N I N G
!
Before performing preventative maintenance, familiarize yourself with the
operation of the machine. Always block the elevating assembly whenever it is
necessary to perform maintenance while the platform is elevated.
The daily preventative maintenance checklist has been designed for machine service and mainte-
nance. Photocopy the checklist page and use the checklist when inspecting the machine.
INSPECTION AND MAINTENANCE

Table of Contents

Other manuals for Snorkel UL40

Related product manuals