EasyManua.ls Logo

Sofar CH1000 - Product Installation; Tool Preparation

Sofar CH1000
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 4 Product InstallationProduct Installation
4.1 4.1 Tool PreparationTool Preparation
You must obtain the following tools before installing the CH1000:
Number Tool Description Purpose
1
Wire stripper Wire stripping
2
Phillips screw-
driver
Fixed guide clips and
ST5*30 self-tapping screws
3
One-piece screw-
driver
Connect a wire
4
Hammers
Knocking plastic expansion
tubes
5
Percussion drill Wall punching
6
Permanent
marker
Marking the mounting
position
7
Heat gun Heat shrinkable tubing
8
Tape measure Measuring distance
9
Heat shrink tub-
ing
Wrapped cables
10
Multimeter
Check that the cable wiring
is correct
16/92 SOFAR CH1000
Product Installation

Table of Contents