EasyManua.ls Logo

Sofar CH1000 - System Operation; Check before Operation; Operational Steps

Sofar CH1000
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 6 System operationSystem operation
6.1 6.1 Check before operationCheck before operation
You need to double check the following before running the system:
CH1000 is fully installed
All cables are well connected and are strong and well insulated
power supply adapter plugged into outlet or rail power is powered up
6.2 6.2 Operational stepsOperational steps
1. CH1000 is connected to the power supply.
2. Check the CH1000 indicator status.
3. Ensure that CH1000 is normally connected to its sub-devices (inverter/me-
ter) and that the sub-devices are normally powered..
4. Connect your computer to CH1000 with a network cable and use the local
WEB, or directly use the APP for local tuning. After the tuning is completed,
you can monitor the data remotely using SOFAR Cloud/APP.
Installation and User Manual 39/92
System operation

Table of Contents