EasyManua.ls Logo

Sofar CH1000 - Operation Log

Sofar CH1000
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. 3. Meter device control
Click the device detail page, select the meter, and click the “
” button on the
upper right corner to enter the remote control page. Users can set CT ratio for
the meter.
8.2.8 Operation Log8.2.8 Operation Log
After entering the plant, select the corresponding device, and click the “
button in the upper right corner to enter the Control Log page, where you can
view the records of all the operations you have performed on the device.
72/92 SOFAR CH1000
SOFAR Cloud /APP Operation

Table of Contents