EasyManua.ls Logo

Sofar CH1000 - Page 26

Sofar CH1000
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Tilt the product at a certain angle, snap the top of its back DIN-rail clip
hook into the DIN-rail, then press the lower part of the product to the DIN-
rail, and when you hear a clicking sound, the installation is complete (As
shown in the figure below).
NOTICE NOTICE
When removing the DIN-rail, push the DIN-rail firmly toward the upper
edge of the catch and then break out the lower edge of the DIN-rail. Do
not break out the DIN-rail directly. The edges of the DIN-rail are sharp,
please touch them carefully to avoid scratching.
4.3.3 Desktop flat4.3.3 Desktop flat
Place the CH1000 flat on a table with no obstructions around the antenna. As
shown in the figure below.
Installation and User Manual 21/92
Product Installation

Table of Contents