EasyManua.ls Logo

Sofar CH1000 - Page 4

Sofar CH1000
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Cable Connections ..............................22
5.1 Preparation for Connection ................................ 22
5.2 Connecting RS485 Terminal Block.......................... 22
5.3 Connecting LINK/RS485-3 ................................. 27
5.4 Connecting Etherne ....................................... 29
5.5 Installation of antennas and SIM card ...................... 29
5.6 Connecting the power supply .............................. 31
5.7 Connecting the DO signal cable (Reservation)............... 32
5.8 Connecting the DI signal cable (Reservation)................ 33
5.9 External emergency stop switch ........................... 34
5.10 Connecting the AI signal cable(Reservation) ................ 35
5.11 Connecting the DRMs port................................. 36
5.12 Inspection after installation ................................ 38
6 System operation................................39
6.1 Check before operation .................................... 39
6.2 Operational steps.......................................... 39
7 Parameter Configuration.........................40
7.1 Introduction to the WEB interface .......................... 40
7.2 Plant Overview ............................................ 41
7.3 Plant Manage ............................................. 41
7.4 Communication ........................................... 47
7.5 Device Manage ............................................ 48
7.6 Protocol Conversion ....................................... 50
7.7 Third Party Device ......................................... 52
7.8 System Settings ........................................... 53
8 SOFAR Cloud/APP Operation.....................55
8.1 APP Local Commission..................................... 55
8.2 SOFAR Cloud Remote Control.............................. 66
8.3 APP Remote Control....................................... 75

Table of Contents