Loading...
Indication
ON/ OFF/
P
Switch
Position
LEDColor
Comment
Red Green Blue
Inverter
firmware
upgrade
ON / P Alternating Alternating Alternating
The upgrade
process can take
up to 5 minutes
Error Any ON
ON/ OFF/
Blinking/
Flickering
ON/ OFF /
Blinking
Refer to
Errors
and
Troubleshooting
on page 55
The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
ON/
OFF/ P
Switch
Position
LEDColor
Comment
Red Green Blue
Percentage of AC
Production:
0 %
ON (1)
OFF OFF OFF
This indicates
power
production as
percentage of
rated peak AC
output power
Percentage of AC
Production:
0 - 33 %
OFF ON OFF
Percentage of AC
Production:
33 - 66 %
OFF OFF ON
Percentage of AC
Production:
66 - 100 %
OFF ON ON
Mounting the Inverter
The inverter is supplied with a mounting bracket kit:
Figure 6: Mounting bracket
Chapter 3: Installing the Inverter 25
Single Phase Energy Hub Inverter MAN-01-00812-1.1

Table of Contents

Related product manuals