EasyManua.ls Logo

SolarEdge Energy Bank - Page 48

SolarEdge Energy Bank
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The monitoring platform includes a built-in help system that guides you
through the monitoring functionality.
For more information, refer to https://www.solaredge.com/products/pv-
monitoring#/.
Creating Logical and Physical Layout using
Installation Information
To display a logical layout, insert the inverter serial number in the new site created in
the monitoring platform. When the communication between the inverter and the
monitoring server is established, the logical layout is displayed.
To display a physical layout, you need to map the locations of the installed power
optimisers. To map the locations, use one of the methods described in the next sections.
Designer
Designer recommends inverter and Power Optimiser selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
For more information, refer to
https://www.solaredge.com/products/installer-tools/designer#/.
Mapper Application
Use the Mapper smart phone application to scan the Power Optimiser
and inverter 2D barcodes and create a virtual map of a PV site for
enhanced monitoring and easier maintenance.
The Mapper
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the Power Optimiser serial number to the correct module
in the system physical layout.
For detailed information, refer to the
Mapper
demo movies:
Creating new sites using the Mapper mobile application
Chapter 6: Activating, Commissioning and Configuring the System 47
Single Phase Energy Hub Inverter MAN-01-00812-1.1

Table of Contents

Related product manuals