EasyManua.ls Logo

SolarEdge Home Battery 48V - Selecting and Preparing the Installation Site; Configurations; General Guidelines and Requirements

SolarEdge Home Battery 48V
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Selecting and Preparing the Installation Site
Make sure to observe the following requirements, when selecting an installation site.
Configurations
The term
Battery module
refers to a single battery. The term
Battery Tower
or
Tower
refers to a number of modules stacked on top of each other and connected in parallel.
The term
Battery pack
or
Battery
refers to all the battery modules connected to each
other and to the same inverter, in one or two towers.
Connect up to 5 battery modules in two towers (maximum 3 in a tower).
Home Battery 48V Installation Guide MAN-01-00954-1.1
10Selecting and Preparing the Installation Site

Related product manuals