EasyManuals Logo
Home>SolarEdge>Inverter>Inline Energy Meter

SolarEdge Inline Energy Meter User Manual

SolarEdge Inline Energy Meter
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
Configuring the Dual-Meter Connection
Configuring Dual-Meter Connection Using SetApp
In the sample configuration described below, a SolarEdge energy meter with Modbus
connection is configured as a production meter, and is set to address 1, while an inline
meter is configured as an export/import meter, and is set to address 2.
To configure the SolarEdge energy meter with Modbus connection using SetApp:
1. Verify that the meter at address 1 is configured as a production meter. From the
SetApp main menu, select Communication è RS485-x è Meter 1
2.
Verify the value of the following parameters:
Meter Function è Inverter Production
Protocol è SolarEdge
Device ID è 1
3.
Select Meter 2 to configure the export/import meter in the following steps:
4. Select Meter Function, and select Export+Import.
5. Set the inline meter's Modbus ID to address 2.
Verifying Meter Connections
Verifying the Meter Connections using SetApp
To verify the connectivity of two meters using SetApp, refer to
Verifying the Inline
Meter Connection using SetApp
on page 33
Troubleshooting Dual-Meter Connections
Troubleshooting Dual-Meter Connections using SetApp
To troubleshoot the connectivity of two meters using SetApp, refer to
Troubleshooting
the Meter using SetApp
on page 36
Inline Energy Meter with SolarEdge Energy Net Communications
40 Configuring the Dual-Meter Connection

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge Inline Energy Meter and is the answer not in the manual?

SolarEdge Inline Energy Meter Specifications

General IconGeneral
BrandSolarEdge
ModelInline Energy Meter
CategoryInverter
LanguageEnglish

Related product manuals