EasyManua.ls Logo

SolarMax 13MT2 - User Manual

SolarMax 13MT2
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SolarMax MT-Serie
8MT2 / 10MT2 / 13MT2 / 13MT3 / 15MT2 / 15MT3
Gerätedokumentation n Instruction manual n Documentation d’appareil
n Documentación del dispositivo n Documentazione dell’apparecchio

Table of Contents

Other manuals for SolarMax 13MT2

Questions and Answers

  • S
    Stephanie Woodward DVMSep 13, 2025
    What should I do if my SolarMax Inverter displays 'Error DC polarity'?
    • M
      marcussnyderSep 13, 2025
      This message indicates that one or more DC connections are connected incorrectly (incorrect polarity). Connect the DC supplies correctly.
  • M
    Michelle RuizSep 12, 2025
    What should I do if my SolarMax 13MT2 Inverter displays 'L and N interchanged'?
    • P
      Pamela MaxwellSep 12, 2025
      This message indicates that a phase and the neutral conductor are incorrectly connected (interchanged). Connect the AC supplies correctly.
  • A
    aaguilarSep 12, 2025
    What does 'Burst error' mean on my SolarMax 13MT2?
    • C
      cwolfSep 12, 2025
      A 'Burst error' indicates that the inverter disconnected from the grid five times or more on the same day. This warning is displayed for the remainder of the day. Check your plant’s status logger in MaxWeb xp (if present) or check the grid parameters. If this happens repeatedly, contact our SolarMax Service Centre.
  • K
    Kim CastroSep 10, 2025
    What to do if SolarMax 13MT2 displays 'Mains error Mains error BP'?
    • H
      Harry FrancoSep 10, 2025
      This indicates that the grid has been switched off. If this problem continues to occur, contact the responsible grid operator.
  • A
    Andrea SullivanSep 9, 2025
    What to do if SolarMax 13MT2 Inverter shows 'Vac 10min too high (L1 L2 L3) Vac 10min too high BP (L1 L2 L3)'?
    • L
      Lauren WarrenSep 9, 2025
      The maximum 10-minute average value of the mains voltage at the specified phase is too high. If this problem continues to occur, contact the responsible grid operator.
  • D
    David BentonSep 8, 2025
    What to do if my SolarMax Inverter displays 'Insulation fault DC Insulation fault DC BP'?
    • J
      jordanpennySep 8, 2025
      This indicates that the insulation resistance of the PV generator against earth is too low. Check the PV generator to resolve this issue.
  • M
    Mary ClarkAug 23, 2025
    What to do if SolarMax 13MT2 Inverter displays a blank screen?
    • A
      amberhallAug 23, 2025
      If the SolarMax Inverter display remains blank, several factors could be at play. First, ensure that the DC disconnector Q1 is switched on. If it is, check that the irradiation is sufficient for operation; if not, wait. Also, verify that the PV generator strings are correctly connected. An incorrectly connected PV generator (where plus and minus connections have been mixed up) can also cause a blank display, so ensure proper connection. If none of these resolve the issue, it could indicate an internal failure.
  • S
    Sara ParkerSep 6, 2025
    What to do if SolarMax 13MT2 shows 'No mains No mains BP'?
    • K
      kimcaitlynSep 6, 2025
      This message means that there is no mains voltage or the AC supply has been interrupted. You should check the AC supply to resolve this issue.
  • C
    cbaileySep 5, 2025
    What does it mean when my SolarMax 13MT2 Inverter shows 'Vdc too high (VDC3, VDC2, VDC1)'?
    • M
      Marc YoungSep 5, 2025
      This message indicates that the DC input voltage at the specified DC connection is too high. Immediately switch off the DC disconnector Q1 and disconnect the PV generator from the inverter. Then, check the sizing of the PV generator.
  • R
    richardmatthewsSep 4, 2025
    What to do if the display of my SolarMax 13MT2 remains blank?
    • L
      Laurie MitchellSep 4, 2025
      If the display is blank, several factors could be at play. First, ensure that the DC disconnector Q1 is switched on. If it is, check if the irradiation is sufficient for operation; if not, wait. Also, verify that the PV generator strings are correctly connected. If these steps don't resolve the issue, and the PV generator connections are correct, it may indicate an internal failure.

Summary

About this instruction manual

Target Audience, Manual Location, and Symbols

Identifies users, manual storage, and explains symbols.

Symbols on the Inverter

Explains symbols displayed directly on the inverter unit.

Safety Instructions

Appropriate Use and Safety Precautions

Details intended use, dangers, and necessary precautions for safe operation.

Product Description

Inverter Overview, Circuit Diagram, and Dimensions

Explains inverter function, shows circuit diagram, and lists external dimensions.

Installation Guide

Transport, Storage, Siting, and Lightning Protection

Guidelines for handling, placement, and protection against environmental factors.

Scope of Delivery and Installation Procedure

Lists included items and details the physical mounting process.

Electrical Connections Overview

Overview of available connection points for AC, DC, and communication.

Integrated Overvoltage Protection

Details surge arresters on DC and AC sides for protection.

AC Connection Details

Step-by-step guide for connecting AC power cables.

DC Connection Details

Explains DC input connections for MPP trackers and wiring rules.

Status Signalling and External Input Monitoring

Explains status contacts and monitoring of external inputs.

Communication Sockets and Protective Conductors

Describes RJ45 ports and requirements for protective conductors.

External ELCB and Protective Conductor

Information on leakage current sensor and protective conductor requirements.

Commissioning Process

Switching On;Off and Initial Setup

Procedure for powering up, down, and first-time configuration.

Inverter Operation

Graphics Display, Menu Navigation, and Structure

How to use the display, buttons, and navigate menus.

Measured Values and Statistics Access

How to view current data and historical performance logs.

Configuration Settings and Parameters

Details on adjusting operating parameters and advanced functions.

Information Display and Auto Test

Accessing device info and performing grid compliance tests.

Data Communication

Communication Platforms and Interface Configuration

Overview of software, hardware, and interface setup.

Options and Accessories

Accessory Components List

Lists available add-on units like MaxMeteo and MaxDisplay.

Operating Status and Communications

Status Indicators, Booting, and Mains Operation

Explains indicators for inverter status, warnings, and startup/operation phases.

Communications Activity Symbols

Icons indicating data transfer via RS485 or Ethernet.

Troubleshooting and Support

General Troubleshooting, Warnings, and Failures

Guides for diagnosing and resolving common operational issues.

SolarMax Service Centre Contact

Details on how to contact support for technical assistance.

Maintenance

Routine Maintenance and Disposal

Recommended checks and instructions for end-of-life disposal.

Technical Specifications

Electrical Values, Efficiency, and Ambient Conditions

Detailed electrical parameters, efficiency ratings, and operating environmental limits.

Configuration and Country-Specific Settings

Details on configuration parameters and variations by country.

Guarantee and Warranty

Guarantee Terms, Exclusions, and Service

Explains coverage, duration, limitations, and warranty service provisions.

SolarMax 13MT2 Specifications

General IconGeneral
BrandSolarMax
Model13MT2
CategoryInverter
LanguageEnglish

Related product manuals