EasyManua.ls Logo

Spinlab Bird Dog Plus 5000 - Page 23

Default Icon
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Step 4.7—Press the START button.
Step 4.7—Once the sensor sees a pulse or a disk rotation, the test will begin. The test
will automatically stop once the final revolution or pulse is detected.
Steps 5.1 & 5.2—Review the METER VERIFICATION screen for proper
ACCURACY & press the MV SAVE button.
Step 5.3—Press the STORE button.
Step 5.4--You have now finished testing the accuracy of the entire meter (all 3 phases)
and storing the data in memory.