EasyManua.ls Logo

SPOT Mayhem 130 - Page 19

SPOT Mayhem 130
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
3. Leaving a small amount of slack between the front and rear triangle, connue to route the line up
the down tube along the groove using the supplied p-clip and zip es.
4. Make any changes to brake line length according to the brake manufacturers instrucons.