EasyManua.ls Logo

SPOT Mayhem 130 - Page 28

SPOT Mayhem 130
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
8. Once the rear shock mounng hardware has been reinstalled, torque the 10mm cap nut to 12N-m
(106in-lb). Gently return the rear triangle/suspension to its full extended posion by pulling
downward near the rear axle and remove the protecve cloth towel from the linkage.
9. Swing the forward eyelet of the shock into the mounng tabs on the top tube. Reinstall the shock pin
with the head on the drive side. Install and torque the screw to 10-11 N-m (88-97in-lb).