EasyManua.ls Logo

stellar labs CDT Plus 7621 - Wire Rope and Sheave Configurations

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 12 | Stellar
®
Heavy-Duty Telescopic Crane Owner’s Manual
Wire Rope/Sheave Configurations
PIN "A"
PIN "B"
Standard 2-Part Line
Sheave Flipped Down
Capacities as shown on load chart.
Single Part Line
Sheave Flipped Down
1) Remove PIN “A” from boom tip.
2) Route wire rope through snatch block.
3) Pin wire rope to snatch block as shown with PIN “A”
Single Part Line
Sheave Flipped Up
1) Remove PIN “B”.
2) Flip sheave.
3) Insert PIN “B” with sheave in upright position.
PIN "B"
PIN "A"
PIN "B"
PIN "A"

Table of Contents

Related product manuals