EasyManua.ls Logo

stellar labs CDT Plus 7621 - Manual Operation Procedures

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 30 | Stellar
®
Heavy-Duty Telescopic Crane Owner’s Manual
Manual Operation
Model 14530 Manual Operation
If the remote control malfunctions, follow these steps to operate the crane manually:
1. Activate Flow Control. Turn the override screw on proportional
flow control counter-clockwise. Full adjustment is between
three and five turns.
2. Operate Solenoids. Using the identification decal as a guide,
slide the knurled sleeve out and then push or pull to operate
the desired function. Be sure the sleeve is in the center, locked,
position before returning to remote operation.
3. Deactivate Flow Control. Turn the override screw clockwise until
stopped. Full adjustment is between 3 and 5 turns.
4. Return the valve bank manual overrides to the neutral position.
Failure to return the valve bank manual overrides to
the neutral position can result in unexpected crane movement.
5. Have the unit serviced immediately to restore remote control
functionality.
If the remote control malfunctions, follow these steps to operate the crane manually:
1. Activate Flow Control. Turn the override
screw on proportional flow control
clockwise. Full adjustment is between
1.5 and 2 turns.
2. Operate Solenoids. Using the
identification decal as a guide, push
the corresponding button to operate
the desired function.
3. Deactivate Flow Control. Turn the
override screw counter-clockwise back
to its original position (between 1.5 and
2 turns).
4. Have the unit serviced immediately to
restore remote control functionality.
WARNING
Override Screw
(Flow control)
Winch
Up
Ext
Out
Ext
In
Main
Up
Main
Down
Rotate
CCW
Rotate
CW
Winch
Down
Flow Control Valve
Solenoids

Table of Contents

Related product manuals