EasyManuals Logo

STEYR 6 CYLINDER User Manual

Default Icon
331 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #194 background imageLoading...
Page #194 background image
Page FUEL SYSTEM - 38 Z001019/0_7_July 2012
03 FUEL SYSTEM
SERVICE MANUAL MARINE ENGINES
 Check: Defectiveunitinjector(s)is/aretobedetecteddenitelybymeansof"manualinjection
test methode"
(manual injection test methode, refer to 03.14.01)
Manual: If during disengagement methode of injection of unit injectors a creaky noise is to
be heard and a solide resistance (pressure point) can be felt, check the tightening
torque of the unit injectors (03.02.02 - assembly item 11).
Then repeat check 3.
If a bubble formation appears during load operation, continue with check 3.
Check 3: Start the engine, bring it to operating temperature, test the boat under operating
conditions and observe the glass bulb.
Result: If it comes to bubble formation, search for the problem in the area of unit injectors.
 Control: Defectiveunitinjector(s)is/aretobedetecteddenitelybymeansof"Disengagement
methode of injection"
(manual injection test methode, refer to 03.14.01)
If there is still bubble formation, continue with check 4.
Check 4: Test the engine in the operating state where bubble formation occurs, by disengage-
ment of injection per cylinder one after the other.
(Disengagement methode of injection, refer to 03.14.02).
Assembly is done in reverse order.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the STEYR 6 CYLINDER and is the answer not in the manual?

STEYR 6 CYLINDER Specifications

General IconGeneral
BrandSTEYR
Model6 CYLINDER
CategoryEngine
LanguageEnglish

Related product manuals