subzero.com | 7
Site Preparation
Placement
CAUTION
Before moving the unit into position, secure door(s)
closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip brackets are properly
engaged.
IMPORTANT NOTE: If used, the side panels must be
installed before the unit is placed in its final position. Refer
to page 9.

Other manuals for Sub-Zero Classic Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sub-Zero Classic Series and is the answer not in the manual?

Sub-Zero Classic Series Specifications

General IconGeneral
SeriesClassic Series
BrandSub-Zero
Refrigeration TypeDual Refrigeration
LightingLED
Defrost SystemAutomatic
Air PurificationYes
FinishStainless Steel
Energy Star CertifiedYes
Width36 inches
Height84 inches
ConfigurationSide-by-Side
Preservation SystemAir Purification
Ice MakerYes
Door FinishStainless Steel

Related product manuals