TD_20210219_SG30-50-110CX Commissioning Guide_V1.1 Page 1 of 21
© SUNGROW AUSTRALIA GROUP PTY LTD All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
SG30/50/110CX Inverters Commissioning Quick
Guide (with Logger1000 and EyeM4)
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168
258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement
or advice on any of the Electrical or Solar Industry standards or guidelines. Please observe all OH&S
regulations when working on Sungrow equipment.
This document only applies to Sungrow Power three-phase inverters (including
SG30CX, SG50CX and SG110CX) with Logger1000 or EyeM4. The information in this
document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new
technology, etc. There are several factors that could cause actual results and
developments to differ materially from those expressed or implied in the predictive
statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Sungrow Power may change the
information at any time without notice.