1 Introduction
This quick guide is showing how to commission the SG30/50/110CX inverters and it
is to be read in conjunction with the Sungrow’s User Manuals.
Where more than one inverter, or an energy meter installed, the commissioning and
iSolarCloud connection is done via a Logger1000(Up to 30 devices) and EyeM4(Up to
10 devices).
For export control and load consumption, an energy meter (DTSD1352-C/1(6)A with
external CT) needed to be connected.
All of the components are connected via daisy-chain as per standard RS485 topology.
Logger 1000
RS485 A
RS485 B
RS485 A
RS485 B
3-Phase meter
Inverter 1
Inverter n

Other manuals for Sungrow SG30CX

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SG30CX and is the answer not in the manual?

Sungrow SG30CX Specifications

General IconGeneral
BrandSungrow
ModelSG30CX
CategoryInverter
LanguageEnglish

Related product manuals