EasyManua.ls Logo

SunStar SPS/D-BH6000-02

SunStar SPS/D-BH6000-02
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
B. Install the grounding line which is linked to the sewing
machine and the control box.
[ Fig. 10 ]
C. When the cables are fully connected between the
machine and the control box, fix them below the table as
in the figure. (estimate the length of cables based on the
consideration that the machine should be lifted for fixing
the cables)
[ Fig. 11 ]
Control box
Control box
Grounding line

Table of Contents

Related product manuals