THREE PHASE HI 25/50kW | Installer Manual26
CHNT Meter with CT Coil
NOTE:
When the inverter is in the o-grid state, the N line needs to be connected to the earth.
In the nal installation, a breaker certied according to IEC 60947-1 and IEC 60947-2 shall be installed
with the equipment.
Three-Phase Smart Meter
SET ESC
7
2524211917161413
3 96 10
GRID
Parallel_1 Parallel_2Meter
Inverter
L1
L2
L3
N
PE
Grid
Home Load
L1
L3
N
PE
L2
CT1
CT2
CT3
RS485A
RS485B
N
L1
L2
L3
Three-Phase Smart Meter
SET ESC
2524211917161413
3 96 10
RS 485
CHNT DTSU666
(3,6,9,10)
3 13146 9 10 16171921
L1
L2
L3
230/400V,3~
250A/50mA
50/60Hz
AC Breaker
AC
Breaker
CHNT Meter

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SunSynk SUNSYNK-25K-SG01HP3-EU-BM2 and is the answer not in the manual?

SunSynk SUNSYNK-25K-SG01HP3-EU-BM2 Specifications

General IconGeneral
BrandSunSynk
ModelSUNSYNK-25K-SG01HP3-EU-BM2
CategoryInverter
LanguageEnglish

Related product manuals