31
3. MACHINE OPERATION
3.1 MACHINE WORKING ENVIRONMENT
(1) Machine adjustment is not needed below the altitude of 2300m.
(2) The machine should work at a temperature above -30 ℃ and you should fully preheat
machine before starting it.
(3) You can run it all day even on rainy or snowy days but have to obey corresponding safe
operation instructions.
3.2 RUNNING AND OPERATION
1) Watch engine running carefully
2) Every 8-hour operation or everyday
z Carry out the 8-hour operation or everyday maintenance.
z Pay attention to liquid leakage.
z In the first 100-hour or when work in mud, lubricate the pivot of working instrument every
other 8 hours’ operation.
3) After first 50-hour operation
z Carry out 50-hour operation maintenance.
z Check the torque of detectable fastener.
4) After first 100-hour operation
z Pay special attention to the first 50 hours’ running until you are familiar
with the sound and feelings of new machine.
z Operate the machine with the engine power limited in the range of 80% of the
full load
z Avoid excessive engine idle.
z Check the indicators and indicate lamps frequently during operating.
z The manual only applies to normal working conditions, when the machine works
in other potentially dangerous conditions, such as conditions with
inflammable, explosive materials, dust and poisonous chemical materials,
you should obey corresponding safe operation instructions and regulations.
z When the machine is used with other purposes not in this manual, you have
to get the consent of Sunward or its agents and obey relative regulations
in the place where the machine is used.