EasyManua.ls Logo

SUNWARD SWE25UF - Oil Filter Replacement and Hose;Pipeline Checks

SUNWARD SWE25UF
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
Recommended periodic hose placement list
Periodic replaced parts
Replacement
Interval
Engine
Fuel hose (from fuel tank to precipitator, from precipitator to oil
feeding pump)
1.5 years
Machine
Body
Pump inhaling hose (from oil tank to main pump)
2 years
Pump output hose (from pump outlet to multipurpose valve)
2 years
Multipurpose valve hose (from multipurpose valve to working
device, slewing coupler, slewing motor)
2 years
Low pressure hose (pilot hose, oil-returning hose)
2 years
Working
Device
Boom cylinder hose
2 years
Arm cylinder hose
2 years
Bucket cylinder hose
2 years
Note: Make sure to replace seals (such as O ring) when replace hoses.
4.2 MAINTENANCE GUIDE
4.2.1 ADD LUBRICANT GREASE
★★ Means that these parts need maintaining when work in water or mud.
Recommended lubricant grease brand and specification
Position: bucket, arm, boom, slewing gear, slewing bearing, etc.
From 20 to 40Cfrom 4 to 104F
BP petroleum
BP Energrease LsEP2
Caltex petroleum
Multifax EP2
Esso
Beacon EP2
Japan
Daphne Coronex Grease EP2
Mobil petroleum
Mobilux EP2
Germany
2# lithium grease
Shell
Shell Alvania EP Grease 2
Remark
Heavy duty lithium grease
NoteThe excavator departed from factory has been filled with “★” marked engine
oil.

Table of Contents

Related product manuals