EasyManua.ls Logo

SuperFlow SF- 902S - Post Test; Shutdown

SuperFlow SF- 902S
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
55
Post Test
Each test can be viewed after it is saved. Current data is stored in memory in the Data Acquisition sensor
box. Saved data is on the computer in the location and with the lename specied in the Test Setup screen.
Press “Shift + F3” to select and view the saved test data.
Shutdown
Let the engine cool down as necessary in idle mode, then turn o󰀨 fuel and ignition. When the test cell
ambient temperature and the engine coolant temperature are normal, shut down the test cell pumps and
fans.
5.0 Operation

Table of Contents