EasyManua.ls Logo

Suzuki DF 2.5 - Installation

Suzuki DF 2.5
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-8 POWER UNIT
INSTALLATION
Installation in reverse order of removal paying special attention
to the following steps.
1. Before installing cylinder head gasket, apply bond to both
surfaces of the hatched areas shown in illustration.
99000-31140: SUZUKI BOND “1207B”
2. Insert the dowel pins 1 and place a new cylinder head gas-
ket 2 into position on cylinder.
3. Position cylinder head assembly on cylinder.
4. Apply engine oil to cylinder head bolts.
5. Lightly seat all cylinder head bolts at first.
According to tightening order in figure, tighten bolts in two
steps.
Cylinder head bolt:
1st step 7 N·m (0.7 kg-m, 5.0 lb-ft)
Final step 13 N·m (1.3 kg-m, 9.5 lb-ft)
Do not re-use gasket. Always use a new gasket.
1
2
3
4
5

Table of Contents

Related product manuals