EasyManua.ls Logo

Suzuki drz 400 2000 - Page 144

Suzuki drz 400 2000
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SPEEDOMETER GEARBOX
Apply SUZUKI SUPER GREASE "A"
to
the speedometer gear-
box
dust seal.
For USA
~
99000-25030: SUZUKI SUPER GREASE "A"
For
the
other
countr
i
es
~
99000-25010: SUZUKI SUPER GREASE "A"
Align
the grooves
CD
on
the speedometer gearbox with the
lugs 0
on
the wheel
hub.
FRONT WHEEL
Make sure that the front fork stopper
CD
and the speedometer
gearoox stopper
lV
are Installed as snown.
Tighten
the
front
axle
nut
to
20
N ·m
(2
.0
kgf-m
,
14.5
Ib-ft)
by
holding
the
front axle using the special tools.
mm
09940-34520: T handle
09940-34581 :
Attachment
F
Tighten the front axle pinch bolts @ to the specified torque.
~
Front axle
pinch
bolt
:
18
N·m (1.8 kgf-m, 13.0 Ib-ft)
Tighten the front axle nut to the specif
ied
torque, after tight-
ening the axle pinch bolts.
~
Front axle
nut
:
42
N·m (4.2 kgf-m,
30
.5 Ib-ft)
N
OTE.-
After remounting the front wheel, pump the brake lever a
few
times
to
cheer..:
for
proper
braA:e
operation
.
CHASSIS 6-9
=
http://www.motorcycle.in.th

Table of Contents

Related product manuals