EasyManuals Logo
Home>Synesso>Coffee Maker>MVP Series

Synesso MVP Series User Manual

Synesso MVP Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
65
MAINTENANCE
MAINTENANCE SCHEDULE
Proper and regularly scheduled cleaning and maintenance procedures are CRITICAL for opmum perfor-
mance of your espresso machine.
Daily
1.Backush each brew group without detergent throughout the day. Backush with an espresso industry
approved detergent during the nal cleaning of the night (or aer a busy period) and then again without
detergent to rinse.
2. Purge wands before and aer each use. Wipe wands and steam ps with a damp cloth aer each use.
Clean the wands and steam ps with approved espresso industry milk cleaner during the nal cleaning of
the night.
3. Wipe down the enre machine with a so cloth.
4.Remove portalters, baskets and springs, drip tray and grates and clean all thoroughly. These items are all
dishwasher safe (with the excepon of wooden handled portalters).
5. Slowly pour a pitcher of hot water down the drain to clear grounds debris and prevent blockage.
Weekly
1. Soak portalters and the removed lter baskets in an approved espresso industry detergent and water
soluon. Rinse thoroughly before reassembling and using your portalters.
2. Carefully remove screens and screws from each brew group using a short handled screwdriver and soak
them overnight in a similar soluon as the portalters.
Note: Rinse screens and screws thoroughly before installing and using. Make sure you install the screens
before brewing any shots of espresso. Failure to do so may plug the drain lines with coee grounds. DO
NOT overghten the screw during reassembly.
Monthly
1. Check your water ltraon system and make sure the cartridges and lters are changed as needed. In ar-
eas of high mineral content, hard water, high parculate count or in very busy locaons, the ltraon sys-
tems will need to be checked more oen.
Quarterly - See Page 66 for Recommended 90 Day PM List
1. Change portalter gaskets and closely inspect diuser screens and lter baskets, If these items are show-
ing wear, please replace them as soon as possible. Change these items if they show damage or overuse.
2. Briey inspect the machine for leaks or potenal issues. Contact Synesso or your local distributor or ser-
vice agent to order parts and/or request service.
Annual - Please Refer to Annual PM Checklist on Page 67
Synessorecommends that you contact your distributor or service agent for periodic maintenance. The fre-
quency of maintenance visits will depend on a variety of factors including how much use the machine re-
ceives, but at least one preventave maintenance visit per year is required. During this yearly service, all
body panels must be removed and all connecons both electrical and hydraulic must be inspected. Small
problems can become large if not caught early.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Synesso MVP Series and is the answer not in the manual?

Synesso MVP Series Specifications

General IconGeneral
BrandSynesso
ModelMVP Series
CategoryCoffee Maker
LanguageEnglish

Related product manuals