Caution
The foundation height for an outdoor unit should not be less than 500 mm.
Design the foundation so as to protect the unit or sections thereof against sliding or tipping over under wind loads. To
thisend,carryoutacheckofwindforces.
Uponjoiningandinterconnectingindividualcompactunits,afxtheroofelementsontotheairhandlingunittop
according to the equipment design documents, and ensure that the joints are sealed against water. In the event the roof
elementshavebeenafxedinthefactory,mountingonsiteisnotnecessary;however,sealingthejointsagainstwater
is necessary in this case as well.
Thejointsbetweentheintakeandextractairductingconnectionsandtheductsmustbewatertight.Incaseswhenthe
intakeairintoandextractairoutoftheairhandlingunitrunthroughducts,thejointsbetweentheductconnectionsand
ducts must also be watertight.
For air handling units installed on the roof or at an elevation, provide safe access with a platform if necessary. The
platform in front of the unit service side or around the unit should be constructed so as to avoid the build-up of snow in
frontoftheintakeairopeninginwinter,whichmightleadtoexcessivesnowingressintotheunit.
The platform must ensure safe climbing to and descending from the unit and safe maintenance.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SystemAir KA HSI-2-2-S-R-50F-TB2-L2 and is the answer not in the manual?

SystemAir KA HSI-2-2-S-R-50F-TB2-L2 Specifications

General IconGeneral
BrandSystemAir
ModelKA HSI-2-2-S-R-50F-TB2-L2
CategoryFan
LanguageEnglish

Related product manuals