TA I
NSTRUMENTS
TGA 2050 2–7
Installing the
Instrument
Before shipment, the TGA 2050 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
• Unpacking the instrument and its
components and accessory kit
• Inspecting the system for shipping
damageand missing parts
• Filling the heat exchanger
• Connecting the TGA to the TA
Instruments controller
• Connecting the heat exchanger cable and
water lines, purge gas lines, accessories,
and power cable
• Unpacking the balance
• Installing the hang-down wires
• Leveling the instrument and aligning the
hang-down wires
• Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
tt
tt
t
CAUTION: