EasyManua.ls Logo

TA Instruments TGA 2050 - Instrument Installation and Setup

TA Instruments TGA 2050
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TA I
NSTRUMENTS
TGA 2050 2–7
Installing the
Instrument
Before shipment, the TGA 2050 instrument is
inspected both electrically and mechanically so
that it is ready for operation upon proper instal-
lation. Installation involves the following
procedures, described in this chapter:
• Unpacking the instrument and its
components and accessory kit
• Inspecting the system for shipping
damageand missing parts
• Filling the heat exchanger
• Connecting the TGA to the TA
Instruments controller
• Connecting the heat exchanger cable and
water lines, purge gas lines, accessories,
and power cable
• Unpacking the balance
• Installing the hang-down wires
• Leveling the instrument and aligning the
hang-down wires
• Adjusting the sample platform.
If you wish to have your TGA installed by a TA
Instruments Service Representative, call for an
installation appointment when you receive your
instrument.
To avoid mistakes, read this entire chapter
before you begin installation.
Installing the Instrument
tt
tt
t
CAUTION: