132 Replacing Modules TB9400/TN9275 Installation and Operation
© Tait International Limited May 2023
3. Before powering up the base station, check that all power, RF and
system cables are connected correctly and securely at the rear of the
base station.
When refitting modules, make sure they are fitted correctly into the subrack
and all retaining clamps are securely tightened. The recommended torque
for the retaining clamp screws is 17lbf·in (1.9N·m). As well as holding the
modules in place, the retaining clamps push the modules hard against the
rear rail of the subrack to ensure a good ground connection between the
modules and the subrack.
lockedunlocked
b
c

Table of Contents

Other manuals for Tait TB9400

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB9400 and is the answer not in the manual?

Tait TB9400 Specifications

General IconGeneral
BrandTait
ModelTB9400
CategoryAccessories
LanguageEnglish

Related product manuals