EasyManua.ls Logo

Technogym Kinesis - Installation, Adjustment, and Maintenance

Technogym Kinesis
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
08088034
08088033
1.6 Installation and packing
Packing
Each module is supplied disassembled,
protected by cellophane and a carton, and
secured to a wooden pallet.
Lifting and transporting the pack
The packed material can be lifted and carried
with normal lifting equipment.
In order to ensure the safety of persons and
property, you should think carefully about
what lifting and transport equipment to
use, in relation to the equipment’s place of
destination.
OK
NO
1.6 installation and paCking

Related product manuals