EasyManua.ls Logo

Tefcold BLC3 - INSTALLATION PROCEDURES

Tefcold BLC3
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
6. INSTALLATION
6.1 Packing And Unpacking
Handle and install the appliance respecting the information provided by the manufacturer, shown directly
on the packaging, on the appliance and in this manual.
The lifting and transportation system of the packaged product envisions the use of a fork-lift truck or a
pallet stacker. When using these, particular attention must be paid to balancing the weight in order to
prevent the risk of overturning(avoid excessive tilting!).
ATTENTION: When inserting the lifting device, pay attention to the power supply cable and the
position of the feet.
The packaging is made of cardboard and the pallet of plywood. A series of symbols is printed on the
cardboard packaging which highlights, in accordance with international standards, the provisions to which
the appliances are subjected during loading, unloading, transport and storage.
On delivery, check that the packaging is intact and has not undergone any damage during transportation.
The transportation company must be notified of any damage immediately.
The appliance must be unpacked as soon as possible to check that it is intact and undamaged. Do not cut
the cardboard with sharp tools so as not to damage to the steel panels underneath.
Pull the cardboard packaging upwards.
After having unpacked the appliance, check that the features correspond to those requested in the order;
Contact the dealer immediately if there are any anomalies.
Packaging elements (nylon bags, polystyrene foam, staples…) must not be left within reach of
children.
Remove the protective PVC film from the internal and external walls, avoiding the use of metal tools.
6.2 Installation
All the installation phases must be considered, from the moment of creation of the general plan.
The installation area must be equipped with all power supply and production residue drainage
connections and must be suitably lit and respect current laws regarding hygiene and sanitary
requirements.
The performance of the appliance is guaranteed with a room temperature of 32. A higher

Table of Contents

Related product manuals