EasyManua.ls Logo

Tektronix MDO4104 - Page 78

Tektronix MDO4104
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Performance Verification
14. Repeat the pro c
edure for all remaining channels as follows:
a. Push the front-panel button to deselect the channel that you have already
tested.
b. Move the DC voltage source connection to the next channel input to be
tested.
c. Starting from step 9, repeat the procedure for each channel.
15. Repeat tests at 1 MΩ impedance:
a. Set the calibrator to 1 MΩ output.
b. Push the front-panel channel 1 button.
c. Set the Termination to 1MΩ.
d. Repeat s
teps 9 through 14.
70 MDO4000 Series Specifications and Performance Verification

Table of Contents