WMiMrWinnnnTL Preparation
Purpose
-
Use this procedure to verify that the Laboratory DC Power Supply
is in conformance with its specifications as listed in Section 1, Specifications.
It can also be used for incoming inspection of the Laboratory DC Power
Supply.
Performance Verification Interval
-A
performance verification should be
performed whenever the accuracy or functions of the power supply are
in
question.
A performance verification should be used to verify the need for
performing the adjustments in Section 5, Adjustments.
Requirements
for
Before you perform these performance verification procedures, you need to
Performance address the following requirements.
Warm-up Period
The Laboratory DC Power Supply requires
a
20 minute warm-up time in
a
20°C to 30°C environment before
a
performance verification
is
made.
Access
Cabinet removal is not required to perform any of these procedures
Test Equipment
Table
4-1
lists all the test equipment required to perform both the Performance
Verification procedures and the Adjustment Procedures for the PS280
or
PS283
Laboratory DC Power Supply.
PS2S0
&
P32S3 Laboratory DC rower supply Module-Level Service Manual
REV
AUG 1991
4.7