EasyManua.ls Logo

Topens KD702 - Gate Opener Installation Checks; Clearance and Binding Checks; Pull-to-Open Final Securing

Topens KD702
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
5. Make sure that there is a minimum clearance of 2.5cm between the gate and the opener and that the opener
and the Post Pivot Bracket are not binding in both the gate-open and gate-closed positions. If there is not at
least 2.5cm of clearance or if the opener and the Post Pivot Bracket are binding, rotate the Post Pivot Bracket
and/or move the Post Bracket Assembly to obtain the minimum clearance and eliminate the binding. When the
minimum clearance has been obtained and any binding has been eliminated, place the M8 x 30 bolt through the
aligned holes in the Post Bracket and the Post Pivot Bracket.

Related product manuals