Toro 2024 - Bore Path Planning Example; Entry Pitch Calculation Example

Toro 2024
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Giventheaboveinformation,youcancalculatethenumberof
rodsrequiredtoreachyourbeginningpointattheappropriate
depth.Tororecommendsthatyoustarttheentrypointa
distancebackfromyourbeginning-at-depthpointbythe
samedistanceasthelengthofpipesyouwillneedtoreach
thatpoint.Thiswillensurethatyouhaveenoughextraspace
soyouwillnotneedtoover-steeranddamagethepipes.
Thefollowingexampleillustratestheprocessgivenan
installationusingthemaximumentrypitchofthemachine
(26%)onlevelground:
Youinserttherst3m(10ft)ofdrillbit/pipeintothe
groundwithnosteering.Theendofthedrillbitwillbe
76cm(30inches)deep(Figure25).
1
4
2
3
5
g021768
7
6
Figure28
1.26%pitch4.185cm(73inches)7.14.7m(45ft)
2.76cm(30inches)5.203cm(80inches)
3.142cm(56inches)6.208cm(82inches)
Youbeginsteeringupforthenext3m(10ft),pushingthe
pipesinatthemaximumpitchchangeof8%.Thisresults
inachangeofpitchfrom26%atthebeginningofthe3m
(10ft)to18%attheendofthe3m(10ft)foranaverage
pitchof22%.Giventhat,thedrillheadlowersanother66
cm(26inches)andisnow142cm(56inches)deep.
Continuingsteeringupforthenext3m(10ft)atan8%
pitchchange,yourpitchwillchangefrom18%to10%
foranaveragepitchof14%.Giventhat,thedrillhead
lowersanother43cm(17inches)andisnow185cm(73
inches)deep.
Continuingsteeringupforthenext3m(10ft)atan8%
pitchchange,yourpitchwillchangefrom10%to2%for
anaveragepitchof6%.Giventhat,thedrillheadlowers
another18cm(7inches)andisnow203cm(80inches)
deep.
Levelingthedrillheadfrom2%to0%takeslessthan1.5
m(5ft)moreforanaldepthof208cm(82inches).
Reachingthisnalpointtookfourandahalf,3m(10ft)
pipes.Soforthisexampleyourentrypointshouldbe
14.7m(45ft)backfromthebeginning-at-depthpointof
yourinstallation.