Figure5
1.Rollerscraper
3.Greasetting
2.Mountingscrew
2.Slidethescraperupordownuntilagapof0.5to1
mm(0.020to0.040inch)isachievedbetweentherod
andtheroller.
3.Securethegreasettingandscrewto41N-m(30ft-lb)
inanalternatingsequence.
InstallingtheMulchingBafe
(Optional)
1.Thoroughlycleandebrisfromthemountingholeson
therearwallandleftsidewallofthechamber.
2.Installthemulchingbafeintherearopeningand
secureitwith5angeheadbolts(Figure6).
Figure6
1.Mulchingbafe
3.Verifythatmulchingbafedoesnotinterferewith
thetipofthebladeanddoesnotprotrudeinsidethe
surfaceoftherearchamberwall.
WARNING
Donotusethehighliftbladewiththe
mulchingbafe.Thebladecouldbreak,
resultinginpersonalinjuryordeath.
GreasingtheMachine
Beforethemachineisoperated,itmustbegreasedtoensure
properlubrication.Failuretoproperlygreasethemachine
willresultinprematurefailureofcriticalparts.
CheckingFluidLevels
1.Checktherear-axlelubricantlevelbeforetheengineis
rststarted,refertoCheckingtheRearAxleLubricant.
2.Checkthehydraulic-uidlevelbeforetheengineisrst
started,refertoCheckingtheHydraulicFluidLevel.
3.Checktheengine-oillevelbeforeandaftertheengine
isrststarted,refertoCheckingtheEngineOilLevel.
13