EasyManua.ls Logo

Toro 4045 - Drill Head and Tracking System Setup

Toro 4045
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SettinguptheDrillHeadandthe
TrackingSystem
Thedrillheadconsistsof2parts,thedrillbitandthesonde
housing(Figure81).
Figure81
1.Sondehousing
2.Drillbit
Drillbitsvaryinsizeandtypetomeetthevarioussoil
conditionsthatyoumayneedtodrillthrough.Someofthe
possibilitiesareasfollows:
Straightblade—Usedinawiderangeofmediumdensity
soils.
Bentblade—Usedinmediumtosoftsoils.Thisbithas
anadded20degreebendtoincreasesteeringperformance
insoftsoils.
Trianglepointblade—Useinhardandrockysoils.This
bithascarbideedgestoreducewear.
Alloftheabovebitscomeinvaryingwidths.Awiderblade
increasesyourabilitytosteerinsoftsoils.Anarrowerblade
movesthroughhardsoilsbetter.ContactyourAuthorized
ToroDealerforacompletelistofavailableblades.
Thesondesandreceiversareessentialtotracktheposition
ofthedrillheadthroughoutthedrillingoperation.The
sondehousingonthedrillheadopensuptoacceptthesonde
beaconwhichworkswiththereceivertotrackthelocation,
pitch,direction,headorientation,andmoreofthedrillhead.
RefertotheTrackingSystemOperator’sManualforinstructions
onusingthesystem.
Toinstallthesondebeaconintothesondehousingonthe
drillhead,completethefollowing:
1.Replacethebatteriesinthesondebeaconasdescribed
intheTrackingSystemOperator’sManual.
2.Loosenthescrewssecuringthehousingcovertothe
housingandremovethecover(Figure82).
Figure82
1.Sondehousing4.Coverholes
2.Bolts
5.Cover
3.Drillbit
3.Insertthesondebeaconwiththeforwardendtoward
thedrillbitintothesondehousing(Figure83).
Figure83
1.Sondehousing
3.Drillbit
2.Sondebeacon
4.Installthehousingcoverandsecureitwiththescrews
(Figure82).
69

Table of Contents

Other manuals for Toro 4045

Related product manuals