EasyManua.ls Logo

Toro procore sr54 - PTO Shaft Final Assembly and Shield; PTO Shaft Cutting and Shield Installation; Installing the PTO Shield

Toro procore sr54
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note:Cutoffmoreoftheinsidetubeifit
protrudesintothecrossandbearingsectionof
theoutertube.
g237888
Figure18
g237889
Figure19
14.Usingthedimensionsdeterminedinstep11,
locate,markandcutoffjustthesafetyshieldsto
exposethetubes(Figure20andFigure21).
g237890
Figure20
g237891
Figure21
15.Carefullyremoveanyburrsfromtheendsofthe
tubeswithaleandremoveallthelingsfrom
thetubes.
16.Greasetheinsidetube.
Note:Thetelescopingtubesmustalways
overlapby1/2oftheirlengthduringnormal
operationandatleast1/3oftheirlengthduring
allworkingconditions.Duringtransport,when
thedrivelineisnotrotating,thetelescoping
tubesmusthaveasuitableoverlaptomaintain
alignmentofthetubesandallowthemtoslide
freely.
9
InstallingthePTOShield
Partsneededforthisprocedure:
1
PTOshield
Procedure
1.Removethe4bolts,lockwashers,andat
washerssecuredtotherearoftheaerator
gearbox(Figure22).
g010849
Figure22
1.PTOshield
4.Bolt
2.Flatwasher5.Accesspanel
3.Lockwasher
2.MountthePTOshieldtotheaeratorgearbox
withthefastenerspreviouslyremoved(Figure
22).
Aligntheaccesspanel(Figure22)ofthePTO
shieldtothetoporthesidedependingonthe
aeratorframeconguration.
15

Table of Contents

Related product manuals