EasyManua.ls Logo

Toshiba ACE-tronics G9 ASD - Startup and Test

Toshiba ACE-tronics G9 ASD
297 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACE-tronics G9 ASD Installation and Operation Manual 31
Startup and Test
Before turning on the ASD ensure that:
R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
U/T1, V/T2, and W/T3 are connected to the motor.
The 3-phase input voltage is within the specified tolerance.
There are no shorts and all grounds are secure.
All personnel are at a safe distance from the motor and the motor-driven equipment.
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com

Table of Contents

Related product manuals