e-STUDIO200L/202L/230/232/280/282 GENERAL OPERATION June 2004 © TOSHIBA TEC
4 - 2
4.2 Description of Operation
4.2.1 Warming-up
1) Initialization
Power ON
! Heater lamp ON
! Set number “1” reproduction ratio “100%” and “WAIT WARMING UP” are displayed
! Fan motors ON
! Initialization of scanning system
- The carriage moves to the home position.
- The carriage moves to the peak detection position.
- The exposure lamp is turned ON.
- Peak detection (white color is detected by the shading correction plate)
- The exposure lamp is turned OFF.
! “READY (WARMING UP)” is displayed
2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
!"The main motor is turned ON.
- Fuser roller rotated
- Drum rotated
! Initialization of feeding system
- Each drawer tray goes up.
!"Pre-running operation stops after five seconds.
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
!"“READY” is displayed.
4.2.2 Ready state (ready for copying)
Buttons on the control panel enabled
!"When no button is pressed for a certain period of time,
- Set number “1” and reproduction ratio “100%” are displayed. Equipment returns to the normal
ready state.