EasyManua.ls Logo

Toshiba e-Studio 350 - Page 509

Toshiba e-Studio 350
764 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2003 - 2008 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO350/352/353/450/452/453
TROUBLESHOOTING
5 - 73
5
[CB20] Delivery motor abnormality
[CB30] Tray 1/2 shift motor abnormality
[CB30] Movable tray shift motor abnormality
MJ-1022
Rotate the delivery roller by hand. Does it rotate smoothly?
È NO Æ Fix the mechanism.
YES
Is the wiring between the finisher controller PC board and delivery motor (M1) correct?
È NO Æ Correct the wiring.
YES
Is the delivery motor clock sensor (S1) working properly?
È NO Æ Replace the sensor.
YES
1) Replace the delivery motor (M1).
2) Replace the finisher controller PC board.
MJ-1023/1024
Are the tray 1 shift area sensors 1-3 and tray 2 shift area sensors 1-3 normal?
È NO Æ Replace the tray 1/2 shift area sensor boards.
YES
Are the wirings between the finisher controller PC board and the tray 1/2 shift motors (M37/
M38) correct?
È NO Æ Correct the wirings.
YES
Is there any problem with the tray lift mechanism?
È NO Æ Fix the lift mechanism.
YES
1) Replace the tray 1/2 shift motors.
2) Replace the finisher controller PC board.
MJ-1101
Is there any mechanical problem when the movable tray is moved?
È
ÆYES Fix the mechanism.
NO
Is the harness between the movable tray shift motor (M7) and the finisher control PC board
(CN8) disconnected or open circuited?
l
È
ÆYES Reconnect the connector securely.
Replace the harness.
NO
Is there a disconnection of the connector, incorrect installation or breakage of the movable tray
position A, B, and C sensors (S13, S14, and S15)?
l
È
ÆYES Replace the harness.
Reinstall the sensor correctly.
Replace the sensor.
NO
1) Replace the movable tray shift motor (M7).
2) Replace the finisher control PC board.
06/01

Table of Contents

Other manuals for Toshiba e-Studio 350

Related product manuals