6 Commissioning
6.1 Preparing System
1. Check installation and mounting.
2. Connect required lines and devices, e.g. sensors and actuators.
3. Connect supply voltage.
4. Make sure that the correct supply voltage is connected.
6.2 Starting system
ü System is prepared.
See Chap.6.1 Preparing System, Page 53.
è Switch on the plant.
u The device starts the operating system and the application.
u The device switches to the start screen.